SEED WORKS · LOCAL REVIEW DRAFT · 2026-10-02
SEEDWorks

SEED Group / Construction division

From ground
to structure.

Concrete, steel and the interfaces between them. SEED Works brings civil and structural construction into one coordinated delivery scope.

Built on SEED’s industrial and infrastructure experience.

STRUCTURE / INTERFACE STUDYCONCEPT ONLY · NOT FOR CONSTRUCTION01 / STEEL02 / FLOOR03 / CONCRETE
Structural assembly study. Illustrative, not a delivered project.
01 / Concrete & RCC02 / Structural steel03 / Composite coordination

The Works scope

A structure is only as clear
as its interfaces.

Foundations, frame, floor and envelope need a common construction plan. Works focuses on that connection, with design and building-services specialists brought into the right decisions.

01

Concrete & RCC

Foundations, reinforced-concrete structures, industrial floor slabs and the civil works that prepare a facility for use.

Concrete scope
02

Steel construction

Structural frames, fabrication coordination, erection and building envelopes, informed by industrial, aviation and transit work.

Steel scope
03

Composite construction

Steel-and-concrete floor coordination and extension planning. Current evidence includes proposal and quantity-development work.

Scope & evidence

Recorded delivery

Clear-span steel.
A working aviation campus.

SEED’s helicopter MRO hangar at PAC Kamra brings together design-and-build experience, a clear-span structure and the building envelope. The project record states completion in 2020.

Read the project record

SEED experience / 2020

Helicopter
MRO hangar
Project organisation
PAC Kamra
Recorded role
Design and construction
Scope
Structure and envelope

Modern methods, clear status

Better coordination.
Before work reaches site.

Engineering models, coordinated drawings and fabrication planning connect design intent with site execution. New structural systems are considered against project requirements, engineering review and supplier capability.

Proposal-stage composite work and developing space-frame programmes are identified separately from delivered construction.

Explore methods & maturity

Start with the scope

What are you planning to build?

Share the project stage, structural scope and location. The team will help establish the next conversation.

Discuss your project